Factory Automation Upgrade
Upgraded a legacy PLC line to a modern SCADA-integrated automation platform, increasing throughput by 22% with full historian and OEE reporting.
A snapshot of recent engineering, automation and maintenance work delivered by the IAH team.

Upgraded a legacy PLC line to a modern SCADA-integrated automation platform, increasing throughput by 22% with full historian and OEE reporting.

Designed and installed a 320-metre powered conveyor network with sortation and barcode scanning for a national 3PL distribution hub.

Full LV switchgear replacement and cabling retrofit at a 24/7 beverage plant, executed over staged shutdowns with zero production loss.

Mechanical, electrical and fire-safety services for a 12,000 sqm warehouse expansion, delivered turnkey within a 14-week program.

Multi-year PM contract covering rotating equipment, instrumentation and electrical assets across three downstream facilities.

Process-line audit, debottlenecking and partial automation upgrade — reduced unplanned downtime by 38% within 6 months.